2026年11月24日 星期二
全球访问状态:亚洲欧洲美洲非洲大洋洲

Home / Energy Storage / With double-…

With double-flyer energy, China's largest single-body Flying Wheel Energy project is operational

On 6 November, our single-body maximum-power fly-wheel energy project, which operates online at the China Canland Thermal Power Company, marked an important breakthrough in the field of rapid-FM technology in the air-ship storage capacity at the fire power base. Flying wheel energy can be stored on high-speed rotors. When electricity is abundant, the power-driven rotor rotates at a high rate and converts the power into a rotor kinetic energy to store it; when the grid needs to be powered, the high-speed operating rotor re-transmits the kinetic energy out to power。

On 6 November, our single-body maximum-power fly-wheel energy project, which operates online at the China Canland Thermal Power Company, marked an important breakthrough in the field of rapid-FM technology in the air-ship storage capacity at the fire power base.

Flying wheel energy can be stored on high-speed rotors. When electricity is abundant, the power-driven rotor rotates at a high rate and converts the power into a rotor kinetic energy to store it; when the grid needs to be powered, the high-speed operating rotor re-transmits the kinetic energy out to power. It allows for rapid recharge, discharge and smooth operation of the grid, with the advantages of efficient conversion, adaptability and long life of equipment.

The innovation of this networked F-wheel energy project is based on a coordinated model of “5 MW + 0.5 MW inertial flyer” that distinguishes it from the traditional single-fly wheel model, in which two-wheeler co-operation achieves comparative advantage and a hierarchical response, in which 5 MW MVs can effectively respond to large-frequency fluctuations in the electricity grid, and 0.5 MW small ships are responsible for stabilizing small-scale network frequency fluctuations in their daily range. The response time to grid FM can be less than 100 milliseconds for a fire power unit carrying a double-flyer storage capacity, which is over 99.5 per cent of the precision of the adjustment, which can be effective in increasing the group FM performance in more complex situations and providing rapid support for grid frequency stability. The five-megawatt flyer that was shipped was currently the single-body maximum-power flyer in the country, with a regulatory rate of 5 MW/s and a power storage capacity of up to 1250 kilowatt-hours, recharge efficiency of over 85 per cent and a circulation life of up to 10 million times.

The project is led by the Huain Gansu Company, and technology development is carried out by the Siam Hot College. The delivery will result in a significant increase in the fleet ' s FM response capacity, an increase in the regional grid resistance to disturbance and a strong technical support for the safe and stable operation of the grid in the north-west.

Tags: Item
Disclaimer: This article is original content of Global Energy. Unauthorized reproduction is prohibited. Please credit the source and retain the original link when reposting.